When a complex structural remediation project required specialist movement joint product, specified, coordinated and delivered under tight schedule constraints, Silva and MAX FRANK worked together to make it happen.
A Project That Demands Precision
Mascot Towers at 1 to 5 Bourke Street, Mascot, is one of Australia’s most closely watched building remediation projects. The rectification works underway are technically demanding, highly scrutinised and schedule critical. There is no room for the wrong product, a delayed delivery or a supplier who does not understand the application.
The Scale Of The Remediation
On the evening of Friday 14 June 2019, residents were evacuated at very short notice after cracking was found in the building.
The remedial requirements that followed were exceptionally complex and costly, moving from targeted, localised repairs to a major structural stabilisation effort. As at 2020, the estimated total cost to fully rectify the complex had grown from an initial $7 million to roughly $32 million, exceeding $53 million once high-interest strata loan repayments were factored in.
The structural and engineering requirements to make the complex safe fall into three main categories.
Primary structural and foundation stabilisation
- Sub-slab soil remediation. The most critical and urgent requirement. Major geotechnical engineering was needed to improve the bearing capacity of the soil beneath the basement footing slab. Fine particle erosion and land destabilisation, partially suspected to stem from nearby excavations, meant the soil was shifting and threatening structural failure of the north-eastern tower corner.
- Transfer beam rectification. The load-bearing transfer beams in the basement, where significant structural cracking first appeared, required heavy reinforcement and remediation.
- Slab reinstatement. The ground, upper ground and first floor concrete slabs needed extensive reconstruction to remedy severe cracking and structural displacement.
Facade And Masonry Repair
Addressing the extensive cracking, structural deformation and movement shifting through the building’s brickwork piers, external perimeter blockwork walls and decorative masonry.
Reinforcement And Joints
- Expansion and slip joint remediation. Specialised installation and remediation of slip joints and expansion joints across the building was deemed compulsory to manage the building’s movement and stress loads safely.
- Emergency propping. Heavy-duty, multi-level temporary propping in the basement and lower floors had to be continually maintained and upgraded just to keep the building stable while engineering assessments were carried out.
Movement joint remediation was one of the compulsory requirements, and that is where Silva came in.
When the project team required a specialist stainless steel shear force dowel system for permanent movement joint works across the Ground Floor, Upper Ground and Level 1, the structural engineer specified the MAX FRANK Egcodubel®. Silva was contacted, and that is where our involvement began. We went on to supply the MAX FRANK Egcodubel® EDM30HFHQI shear connectors for the permanent movement joints (expansion joints).
What Is The MAX FRANK Egcodubel® System?
The Egcodubel® is a stainless steel shear force dowel system engineered for applications requiring controlled load transfer and movement accommodation across structural joints. Where a permanent movement joint needs to transfer shear forces between two sections of a structure while still allowing those sections to move independently, the Egcodubel® is designed to do exactly that.
The system is manufactured from stainless steel, giving it strong corrosion resistance in demanding environments. It is compact by design, suited to the access conditions common in remediation and infrastructure works, and is backed by MAX FRANK’s established engineering support across the specification and installation process.
Key technical benefits
- Stainless steel construction for strong corrosion resistance in demanding environments
- Transfers shear forces across the joint while accommodating controlled structural movement
- Compact form suited to constrained installation conditions
- Suitable for remediation and infrastructure applications where long term durability is essential
- Backed by MAX FRANK engineering support through specification and installation
More Than A Supply Order
What made this engagement different from a standard product request was the level of technical coordination required before a single unit left our warehouse.
Silva’s engineering team reviewed the structural drawings, prepared detailed movement joint markup drawings and completed a full quantity take off across all three levels, broken into staged delivery batches aligned to the construction schedule. Importantly, during that drawing review our team identified a question around one of the originally specified products and whether it was the right fit for this particular application. We raised it, worked through it with MAX FRANK’s engineering team and the structural engineer, and the specification was confirmed correctly before supply proceeded. That kind of early intervention is exactly where a technically capable distributor earns its place on a project.
Stock Ready, Schedule Met
With commencement dates approaching and the team working to a demanding schedule, there was no time for extended lead times or supply uncertainty. Silva confirmed stock of the Egcodubel® EDM30HFHQI at our Brookvale facility with a two working day lead time, and issued detailed pricing across all three delivery batches within days of receiving the structural drawings. The project team had the commercial clarity they needed to move forward without disruption to their schedule.
Why Partner With Silva For Your Egcodubel® Supply?
Our experience on this project reinforced what we already know: technical capability and supply reliability are just as important as product quality on any remediation site. Silva maintains stock of the MAX FRANK Egcodubel® range in NSW, and our engineering team is experienced in supporting contractors through take offs, specification queries, staged delivery and on site requirements.
Whether you are planning ahead or working to a tight schedule, we are here to help.
Need Egcodubel® dowel systems for your project? Talk to our team about availability, sizing and site support.